Under Slab Plumbing
Getting the stuff from here to there.

Step one: Empty the barn. Easier said than done.

Step two, level the entire area.

Plumbing connections under the slab for a toilet, sink, and water supply.

How much gravel does it take to make a layer 40 x 60 feet, and 4 inches deep? Lots.

The fun part.

Pick it up, take it inside, dump it. Yup that's the fun part.

The "not-so-much-fun-part"? Spreading it out in a level, even layer.

Perfect. Ready for concrete.

Each overhead door has a concrete parking pad.

Each personnel door has a concrete stoop.

A few days to wait, and then a huge concrete delivery!