Installing the final trim on the barn
Jim and Bob hard at work.
Despite there being no mention of these parts in the building assembly manual, the learning curve was very short.
120 feet of trim, 122 screws, 120 feet of rubber backing... piece of cake.
Checking for level.
The view from the barn interior.
The lights are on with the generator running.
Entry door on the left, bathroom on the right.
The sink with the on-demand water heater above.
Better exposure - running water!
There was a bit of rusty sediment in the bowl - scrubbed out easily. We ran the well for a couple of hours and the water was back to being clear.
Click the image to load the video [2.54 Mb WMV file]
From left to right: Water heater vent, hose spigot, room heater vent, bathroom vent, generator connection, electrical outlet.